You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 12 Next »

Here starts my own Building Documentation /Steps and Modification.

Dokumentation: http://thehumancomparator.net/building/

pdf. Dokumentaion :

Schematic: TTSH-schematics.pdf

STATUS ADSR/AR finished on 09 March 2014


ATTENTION -  wiring from PSU to the module headers are wrong "silkreen error"  +/-  must crossed - doublecheck before power up modules


Result from Widy:

BOM Failure - parts not listed
----------------------------------------
1x BC558b S&H  missing ( need 9 ..  BOM say 8)
1x 150K S&H fehlt ( not in building doc)
1x100p fehlt mir einer ( missing part )
 
parts left after build:
------------------------
1x15K
1x47K
1x1M2
2x100N Keramik
1x3p3 Keramik
1x1M Slider

first TTSH Kit arrived on 05.03.2014




Starts soldering the VCO Boards:

Online building documentation failure:

for VCO pcbs in zthees building website shows 1x61k9  but needed on each pcb 2x 61k9 resistors

http://thehumancomparator.net/4027-2/


  


Start assembly Main PCB

Use standoffs/Spacers:

Mounting VCO-1 pcb with long headers, but solder before 150K & 3m3

  



PSU with DC-DC Voltage "regulator"

right picture shows the X-crossed ferrite bead to fix the -15/+15V  silkscreen error

    


VCO testing - wiring a +15v cable to resistor and probe ..

see my solution..

  


VCF picture - handle with care -  2n3904/06 - BC558 doublecheck the position near Tempco 2h

  


AR/ADSR

 

VCA

for testing: test with probe a VCO (need +15V cable see VCO testing above)

feed the VCO signal to the VCA and check the waveform with a oscilloscope.

            

 

 

 

 

 

 

 

Ringmod




  • No labels